Skip to content
IjyaLabs logo
IjyaLabs
Beta — under testing and trial. Do not use for live compliance decisions, statutory submissions, or regulatory reliance. Readiness preparation only, not a certification or audit.
♻️Beta

BCP & DR Review

Business continuity plan quality, disaster recovery runbooks, test cadence, RTO/RPO validation, supplier dependencies, and crisis communication readiness — in one structured review.

Before you start — what to have ready for BCP & DR

Gather these first. Every one of them is something the assessment will ask for, and finding them mid-way is where an assessment stalls.

Decide your scope first

Every control in this framework is assessed, so there is no scope step to complete first. Have these decided before you begin so your answers describe one consistent thing.

  • Which systems, services and locations are in scope — write this down before you answer anything.
  • Who owns each area, so an answer about it is somebody’s to give.
  • The period the evidence should cover, where the framework opines on a period rather than a moment.

Gather these documents

What BCP & DR is assessed against. Find them before you start — the assessment reads what you upload, not what you tell it.

  • Business continuity policy and plan
  • Disaster recovery plan with defined RTO and RPO
  • Business impact analysis (BIA)
  • Backup policy and recent restore-test records
  • Incident and crisis communication plan

Have the right people

Who needs to be involved, and what changes if it is only you.

  • Someone who can find the documents — usually whoever owns the control day to day.
  • A second person to review what was uploaded, if you want reviewed coverage. They must not be the person who submitted or attached that evidence: no one reviews their own work.
  • One person can complete the whole assessment. Reviewed coverage will read zero, and that is accurate rather than a fault.
  • A reviewer’s acceptance is what raises a control from partial to proven, and every workspace has that during the open beta. It becomes something a plan includes once there is anything to buy.

Prepare the files

Upload only what the assessment needs. You are responsible for removing or masking personal and sensitive data that a control does not require — do it before you upload. Continuity plans list emergency contacts and site details. Mask personal phone numbers and home addresses of staff; the plan, the BIA and the test records are what is assessed.

  • Upload digital documents only — a Word file, a spreadsheet, or a PDF with real text. A photograph or a scanned paper has no readable text, so it cannot be assessed or prove a control.
  • A scan or a photograph has no text to read, so it cannot prove a control. Export the original instead.
  • The same file cannot be uploaded twice to one library — it is recognised by its contents, not its name.
  • Upload the document itself, not a summary of it. A summary is your description of the evidence, not the evidence.
  • A document that is not about this framework will be accepted and matched against nothing. It still counts against your library, so it is worth checking before you send it.

Know what you will get

So the result is what you expected when you started.

  • You get a readiness position derived from the evidence you upload, and a list of where the gaps are.
  • You do not get an audit, an opinion, or a certification. Only a licensed auditor, an accredited certification body, or the relevant regulator can give you those.
  • Controls you upload nothing for are reported as UNEXAMINED — not as failed. That distinction is deliberate.
  • A document can support a control without proving it. Supporting evidence raises a control to partial; reaching proven takes evidence a second person independently reviewed and accepted.
16
Controls
Across all domains
Free
Sampler included
Free tier — 8 critical controls
₹2,999/yr
Full assessment
Annual subscription

Your assessment journey

Four steps from your recovery profile to an evidence-backed continuity position.

1
BCP/DR Profile5 min

Your critical processes, RTO and RPO targets, and when the plans were last exercised. It decides what the assessment measures you against.

Open →
2
Assessment10 – 15 min

Sixteen controls across plans, recovery, testing, objectives, dependencies and crisis communications. Anything left unanswered counts as zero.

Open →
3
ResultsInstant

Your readiness position with the gaps ordered by weight, and each gap raisable as a corrective action you can track.

Open →
4
Evidence LibraryAs needed

Each control names the documents that would prove it — a BIA with recovery priorities, a restore test showing the time achieved. Upload them and the score stops being your own opinion of yourself.

Open →
Self-assessed readiness indicator. Not an audit or penetration test. Results are for internal planning use only.